Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set Advanced Medium Ship Manufacturing Efficiency II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
9,604,945,312.40
ISK
Sell Value
24,970,000,000.00
Profit
+15,365,054,687.60
ISK
Margin
61.5%
Build Time
6h 48m
1 run

Materials

11 items
Material Quantity Unit Price Total
1 596.86
144 43,257,600.00
180 279,093,580.20
252 3,071,880.00
1,800 1,891,672,740.00
1,800 615,050,298.00
1,800 28,355,976.00
9,000 8,705,520.00
10,800 903,848,004.00
10,800 5,693,760,000.00
10,800 45,727,200.00
Material Total 9,512,543,395.06
System Cost Index (0.14%) 3,124,702.52
SCC Surcharge (4%) 89,277,214.82
Job Installation Cost 92,401,917.34
Grand Total 9,604,945,312.40

Production Timeline

d
Assembly 6h 48m
1
Standup L-Set Advanced Medium Ship Manufacturing Efficiency II
Standup L-Set Advanced Medium Ship Manufacturing Efficiency II M
1 job, 1 run 6h 48m/job 6h 48m
Total Wall Clock Time 6h 48m

Required Skills

Industry IIIII