Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set Basic Small Ship Manufacturing Efficiency II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
9,876,979,905.24
ISK
Sell Value
19,970,000,000.00
Profit
+10,093,020,094.76
ISK
Margin
50.5%
Build Time
6h 48m
1 run

Materials

11 items
Material Quantity Unit Price Total
1 630.00
144 42,451,200.00
180 490,442,180.40
252 5,063,647.68
1,800 2,707,882,380.00
1,800 327,954,402.00
1,800 6,895,188.00
9,000 8,375,490.00
10,800 1,113,460,020.00
10,800 5,036,564,124.00
10,800 51,178,068.00
Material Total 9,790,267,330.08
System Cost Index (0.14%) 2,932,309.30
SCC Surcharge (4%) 83,780,265.85
Job Installation Cost 86,712,575.16
Grand Total 9,876,979,905.24

Production Timeline

d
Assembly 6h 48m
1
Standup L-Set Basic Small Ship Manufacturing Efficiency II
Standup L-Set Basic Small Ship Manufacturing Efficiency II M
1 job, 1 run 6h 48m/job 6h 48m
Total Wall Clock Time 6h 48m

Required Skills

Industry IIIII